Algorithms achieve fair division of goods and chores over time

Temporal Fair Division: Simultaneous Guarantees for Goods and Chores

Computer Science and Game Theory

Summary

Dividing items fairly among people can be tricky, especially when items come one by one and must be allocated immediately. This paper studies how to fairly assign both desirable items (goods) and undesirable chores over time, ensuring fairness with each new item. The researchers provide algorithms that balance different fairness concepts simultaneously, and prove that these algorithms are as good as possible under their conditions. They also show that some fairness goals can’t be met in certain chore division cases.

What this means in practice

  • For resource schedulers: Use the algorithm to distribute tasks or resources arriving over time fairly among teams with known valuations.
  • For event planners: Assign incoming responsibilities or rewards fairly and immediately to participants as events unfold with predictable preferences.

Authors

Tianqi Chen

Abstract

We study temporal fair division of indivisible items in both the goods and chores settings, with $n \ge 2$ agents and nonnegative additive values or costs. Items arrive one at a time and must be assigned immediately and irrevocably. The arrival order and all agents' values or costs are known in advance, and the cumulative allocation must satisfy the fairness requirements after each arrival. For goods, we give a polynomial-time algorithm that simultaneously achieves exact temporal proportionality up to one item (TPROP1), a $1/n$ approximation to temporal maximin share (TMMS), and a $1/(n-1)$ approximation to temporal envy-freeness up to one item (TEF1). The TMMS factor is optimal. For chores, we give a polynomial-time algorithm that simultaneously achieves exact TPROP1 and a $2-1/n$ approximation to TMMS. Classical scheduling lower bounds based on fixed sequences carry over to chores TMMS, establishing the optimality of this factor for $n=2,3$. For every $n \ge 2$, we further show that $2-1/n$ is the optimal TMMS factor subject to exact TPROP1. For every fixed $n \ge 3$ and every finite $β\ge 1$, we construct an instance of chores admitting no $β$-TEF1 allocation.