Papers for

manufacturing line planners

Papers whose findings have a practical use for this group, as judged from the abstract. Open a paper to read what it means in practice.

Migration can boost job completion rates on varied parallel machines

The Benefit of Migration in Throughput Maximization on Unrelated Machines and under Restricted Assignment

Abstract: In preemptive throughput maximization on parallel machines, jobs have release dates, due dates and weights, and the goal is to maximize the total weight of the jobs completed by their due dates. We study the benefit of migration, i.e., by what factor the optimal weight can increase when a preempted job is allowed to resume on a different machine. By a classic result of Kalyanasundaram and Pruhs, on identical machines the migratory optimum is at most $O(1)$ times the nonmigratory optimum. We give, for the first time, bounds for unrelated machines and for restricted assignment. We show that on unrelated machines, when every eligible machine can complete a job by itself, the migratory optimum is at most $O(\sqrt n)$ times the nonmigratory optimum, where $n$ is the number of jobs. Under restricted assignment it is at most $O(\log n)$ times the nonmigratory optimum. We provide instances which show that both bounds are best possible up to constant factors, even when the jobs have unit weights. Since our proofs are constructive, we obtain the first nontrivial approximation algorithms for migratory throughput maximization on unrelated machines and under restricted assignment.

Fri 20 NovData Structures and Algorithms
The gist
Scheduling jobs on multiple machines to finish important tasks on time is tricky, especially when tasks differ in how they fit on each machine. This paper looks at how allowing a job to pause and then continue on a different machine affects how many jobs can get done on time. The researchers found that for complex machine setups, this job migration can make a much bigger difference than previously known, but only up to certain limits tied to the number of jobs. Their work also gives new ways to approximate the best way to schedule jobs with migration.
Open → 2611.27918v1