Improving scheduling times for weighted tardy jobs on machines

Compressing the Lawler-Moore Dynamic Program for Weighted Tardy Jobs

Abstract: The classic scheduling problem of minimizing the total weight of tardy jobs ($P_m||\sum_jw_jU_j$) asks for a schedule of jobs each with a processing time, weight, and due date on a constant number of parallel identical machines. A job is late in a schedule if it completes after its due date, and an optimal schedule is one where the total weight of all late jobs is minimized. The classic dynamic programming algorithm of Lawler and Moore [Manag. Sci., 1969] solves this problem in $O(nd_{\max}^m)$ where $n$ is the number of jobs, $d_{\max}$ is the maximum due date of any job, and $m$ is the number of identical machines. We show that it is sufficient to only compute part of the dynamic program and obtain the running time $\tilde{O}(n + d_{\max}^{m + 1})$ where $\tilde{O}$ suppresses polylogarithmic factors. This affirmatively answers the open question posed by Hermelin, Molter, and Shabtay [INFORMS J. Comput., 2024], whether a running time of $\tilde{O}(n + d_{\max}^2)$ is possible on a single machine.

Fri 30 OctData Structures and Algorithms
The gist
Scheduling jobs on multiple machines so that the total penalty from late jobs is as small as possible can take a long time with classic methods. The authors found a way to speed up the calculation by focusing only on important parts of the problem. This improvement greatly reduces the time needed to find the best schedule, especially when there are many jobs or large deadlines. They also answered a long-standing question about how fast this can be done on a single machine.
Open → 2610.41821v1

Dynamic metering system measures actual compute in heterogeneous GPU clusters

From Nominal Capacity to Deliverable Compute: Design, Calibration and Validation of the D-PIN SCU Dynamic Metering System

Abstract: Nominal chip specifications do not capture the compute deliverable by heterogeneous distributed networks under communication, runtime and verification constraints. We formalize D-PIN Standardized Compute Units (D-PIN SCU) as a dynamic metering system for deliverable compute. The system combines five-dimensional resource normalization with topology-aware and runtime-corrected metering. A cluster-scale Roofline model yields a closed-form communication ridge, while runtime factors describe thermal, fault and load effects. We show that runtime deviations cannot be identified from nominal specifications alone. Uniform re-anchoring preserves relative metering results, and a simplex-constrained calibration algorithm estimates resource weights. The framework couples Proof-of-Physical-Work verification to a no-arbitrage condition for over-claiming and electricity-aware pricing. An end-to-end recomputation on the Zhangjiang Science Gate production node covers ten heterogeneous 8-GPU servers totaling 59.5 D-PIN SCU. Billed throughput of approximately 33,000 D-PIN SCU-hours is consistent with the physical upper bound at 78% utilization over 720 hours. Derived metrics are 3.02 kW per D-PIN SCU at the supply-and-distribution design boundary and 0.26 D-PIN SCU-hours per delivered kWh. Empirically calibrated chip values differ materially from datasheet projections; the published calibration is not independently reproducible from vendor specifications. Validation is limited to one production node, and the originality claim concerns the integrated system rather than the SCU terminology or individual components. The framework provides a basis for scheduling, verification and pricing of deliverable compute in distributed heterogeneous networks.

Mon 12 OctDistributed, Parallel, and Cluster Computing
The gist
Chip specs usually tell you the max power, but don’t show how much compute you really get in complex systems where communication and other limits matter. The authors designed a method called D-PIN SCU that measures actual deliverable compute by combining resource use, network layout, and runtime conditions. They tested it on a large GPU cluster and found it matches real power and compute use well, showing differences from simple datasheet numbers. This system helps users schedule, verify, and price compute fairly in mixed hardware networks.